• Number :

    +0086 15873162624

  • Email :

    overseas@moldbest.com

Our Products

More than 95% of

MOBEST products are standardized.

p

Standard Products

MOBEST provides Hot Runner solutions at the fastest speed. The standard system delivery time is 5 days, and the hot half mold is 5-8 days.

counter

76

Intellectual property patents

counter

4500

Cooperative clients

counter

3

Manufacturing R&D centers

counter

32

Branches and agents worldwide

about

MOBEST selects global materials

Valve pin and guide bush are all customize by Japan, tolerance is within 0.0015mm, no jam is guaranteed.Holes for valve pin are machined by precision gig grinder.Manifold complies with pin bushing; use CMM to test the verticality and concentricity.Pre-heat the system to ensure smooth movement of the valve pin. The wear-resistant coating has a lifetime of 2 million cycles.

  • Valve Pin

    Imported from Japan,Sweden

  • Steel body

    Imported from ASSAB(Sweden)

  • Coil heater

    Imported from Germany

  • Thermocouple

    Imported from Germany

  • Sprue bushing, Nozzle tip

    Imported from the United States

Temperature Controller

Products

HTMC Integrated Temperature Controller

Intelligent temperature controller developed according to market demand and customer habits, with a simple,analytical and userfriendly temperature control operating system.The friendly operation interface is convenient and reduces the learning cost for you.The one-card of dual-zone design greatly improves the integration of the product and can control more zone groups with a smaller size.

Products

Accuracy of measurement:+0.1%;

Power Requirements:AC185V-245V,50/60HZ

Type:J type K type

Temp Range:45℃ to 550℃

Products

Plug-in Card Temperature Controller

Imultiple modes can be selected for different temperature environments.

Hot Half

MOBEST can provide Hot Halves which can be used in different molds.It's easy to assemble and maintain.For materials with high Glass Fiber, the Valve Pin system is stable.Ther's no jam, no leakage.Hot Runner sytem is designed for 1 million shots,to ensure stable production.The shortest lead time of hot halves is 5~8 days.

certificat
certificat